  1. 1Plan in the main menu opens Tasks.
  2. 2Every project you can see, with its open topics. Select one to see only its tasks, or + to start a new one.
  3. 3The view you are in, All tasks when no saved view is open. Its menu lists the saved views you can open, as does Saved views on the left.
  4. 4Filter narrows the board by assignee, creator, label, squad and priority. To see one project or topic, pick it on the left. Hide statuses takes columns off the board.
  5. 5Display switches the layout between Board (B), List (L) and Gantt (G), and groups the tasks by status, topic or assignee.
  6. 6New task adds a task, or press C. A title is all it needs.
  7. 7Each filter shows as a chip. Save as view keeps the set for yourself or shares it with a squad.
  8. 8A card shows the task's key, effort (2 pt), priority, labels, comments, due date and assignee, with its topic in the band underneath. Drag it to another column to change its status.

Tasks

A task is one piece of work. Create one with New task, or press C on the Tasks page. A task only needs a title: a project and a topic are optional. Ideas collects suggested tasks for review: New idea suggests one, and accepting it makes it a task.

Tasks move through Backlog, Todo, In progress, In review, Blocked, Done and Canceled, and can have a priority, an effort, an assignee, labels and dates.

Layouts
Show tasks as a Board (B), a List (L) or a Gantt chart (G), grouped by status, topic or assignee.
Saved views
Filter the tasks, then Save as view to keep the filter for yourself or share it with a squad.

Projects and topics

A project groups work that has an end, like a launch or a migration. Every project gets its own Atlas wiki automatically.

A topic is one part of a project, with its own status, target date and quarter. Topics belong to exactly one project, so you pick the project first.

Open Plan › Projects & topics to browse both in one place. Use the arrow beside a project to expand or collapse its topics. Search finds project and topic names. Switch between List, Quarter and Gantt at the top.

Details and editing
Select a project or topic row to open Details. With edit access you change its title, description, status and dates there, and the owner also sets Lead and Visibility. Share, Customize and Open board sit in its header and topics list.
Grouping and status
Projects and the topics inside them are grouped by status by default. Use Group by to choose Status or None; your choice is remembered. With edit access, select a row’s status to change it directly.
Lead
The person responsible for the work, shown with their name and avatar in the list. The owner can select Lead there to assign someone or leave it Unassigned. Changing Lead does not transfer ownership or grant access. Created by, shown separately, never changes.
Visibility
Choose Organizational for organization sharing or Private for the owner and named people or squads. A topic’s Organizational audience is limited to people who can see its project; a topic can also be shared directly. The owner manages sharing and Can view or Can edit permissions separately from Lead.
Task keys
A key like WEB-12 comes from the task's topic, or from its project when it has no topic. Moving the task gives it a new key.

Projects and topics in TabTasker

  1. 1Open Plan, then Projects & topics, to browse every project and its topics in one place. Search projects & topics finds project and topic names.
  2. 2List, Quarter and Gantt show the same work as this list, as topics by quarter, or as a timeline. Group by sets Status or None, and your choice is remembered.
  3. 3Collapse all folds every project's topics away. The arrow beside a project opens or folds just that one; open, its topics are grouped by status like the projects.
  4. 4New project and New topic start one. Add topic under a project starts a topic in it.
  5. 5The lead, the person responsible for the work. The owner selects it to assign someone or leave it unassigned.
  6. 6Projects are grouped by status: Active, Paused and Completed. With edit access, select the status on a row, here Paused, to change it directly.
  7. 7Selecting a project or topic row opens its Details beside the list.

A project's Details in TabTasker

  1. 1With edit access, rename the project right in its title.
  2. 2Customize (the gear) opens advanced configuration and access grants. Share gives you a link that opens the project for people who already have access.
  3. 3Expand panel lets Details fill the workspace when you need more room to write, as here. The same button, now Collapse panel, puts it back beside the list.
  4. 4With edit access the description is ready to type. Once you change it, Save description keeps your changes and Discard changes resets them.
  5. 5The project's topics. Select one to open it, or Open board to work on the project's tasks.
  6. 6Discussion lives in Details: the project's comments, kept beside everything else about it.
  7. 7Who created the project, and when. It stays read-only and is separate from the Lead.
  8. 8Status saves as soon as you pick one.
  9. 9The owner can change Lead and Visibility: Organizational shares it with the organization, Private with the owner and the people or squads named.
  10. 10The planning dates save directly too. A start date cannot fall after the due date.

Creating work

Choose New project or New topic in Projects & topics, or Add topic beneath a project to start there. Use New task on Tasks to create a task.

Task, project and topic creation forms open in a panel on the right. Details and editing use the same space. On smaller screens these panels appear over the page; on phones they fill the screen. Use Expand panel when you need more room to write.

Creating a task in TabTasker

  1. 1New task, or C on the Tasks page, opens the form in a panel on the right.
  2. 2Expand panel lets the form fill the workspace when you need more room to write.
  3. 3The Title is the only thing a task needs.
  4. 4The Description is optional: add context or write a checklist.
  5. 5Project and Topic are optional too. A topic belongs to one project, so pick the project first.
  6. 6A new task starts in Backlog and Unassigned. Priority is next; effort, labels and dates are further down the form.
  7. 7Create task saves it once it has a title. Create more keeps the form open for the next one.

Sprints

A sprint is a fixed window of work for a squad or for the whole organization. Open Plan › Sprints: the board shows the backlog and a column for each sprint you tick (the current one and the next to start with), and you drag tasks between them.

A squad can create its sprints automatically: set its sprint cadence to 1 or 2 weeks in Settings › Squads.

The Sprints board

  1. 1Sprints opens from Plan in the main menu, beside Tasks, Ideas and Projects & topics.
  2. 2Search tasks and the All projects picker narrow the backlog and every sprint column to the tasks that match.
  3. 3Pick the squad whose sprints you plan, here Growth. Sprints for the whole organization are under Org-wide.
  4. 4Tick a sprint to give it a column on the board; Now marks the one running today (Current on its column). The bar counts its tasks done, and Open in board opens it on Tasks.
  5. 5Finished sprints with no tasks and no goal fold away. Show 2 previous sprints brings them back.
  6. 6The Backlog column holds every task that is in no sprint, whatever its status; it is not the Backlog status. + on any column adds a new task straight into it.
  7. 7Each ticked sprint gets a column, and the current sprint and the next start ticked. Drag a card between columns to plan it into a sprint or back to the backlog.
  8. 8Statistics for the first sprint on the board: a burn-up of scope, started and done, who holds what, and the sprints before it.
  9. 9New sprint sets its name, goal, squad and dates. Sprint settings opens the Squads settings, where a cadence of 1 or 2 weeks creates a squad's sprints for it.

Keeping a plan honest

Status says where the work is and priority says how much it matters. Keeping the two apart is what keeps a backlog meaningful.

Sprints are optional. Many teams work straight off a board and only use dates. When a team wants a cadence, a sprint gives the weekly review something concrete: what was committed against what moved.

A topic moves through Idea, In planning and Active, then Done or Canceled. An idea can wait a quarter and still be where everyone can find it.

Mind map

The Mind map draws your projects, topics, tasks, Atlas pages, whiteboards, sprints and people as one connected picture, with search, filters and saved views.

The Mind map, centred on a project

  1. 1Search by name or key, then pick a result to put it in the middle. While you type, the ring narrows to what matches.
  2. 2Focus draws one item with everything linked to it, Flow follows the links as branches you open. Two steps adds a second ring, where the people and sprints of these tasks join in.
  3. 3Start from sets what the overview of the whole workspace fans out to: People, Projects, Topics or Sprints.
  4. 4Assigned and Created choose which lines join people to their tasks, and Add filter narrows the map further. Save view (the bookmark) keeps the whole setup under a name, to pick again later.
  5. 5The trail of where you have been. Click Acme to go back to the overview of the whole workspace.
  6. 6The item in the middle, here a project. Click it to open its details.
  7. 7The zoom level. Open it to Zoom in, Zoom out, Reset to 100% or Zoom to fit.
  8. 8Everything linked to it, coloured by type: its topics, tasks, Atlas wiki (the page named after the project) and whiteboards. Click one to move it to the middle.